Pre-completion sound testing
The building regulations establish standards that have to be achieved in the construction of buildings. Part E of the building regulations (resistance to the passage of sound) deals with requirements for sound insulation in buildings, including both new dwellings and the conversion of buildings to form dwellings.
Regulations 41 and 20 require that contractors undertake sound insulation testing for:
- Purpose-built dwelling houses and flats.
- Dwelling houses and flats formed by a change of use.
- Purpose-built rooms for residential purposes.
- Rooms for residential purposes formed by a change of use.
The 'approved documents' provide guidance for how the building regulations can be satisfied in common building situations. Section 1 of Approved document E (pre-completion testing) provides guidance on an appropriate programme of sound insulation testing for a sample of properties to verify that they comply with the building regulations.
Tests are undertaken when building work is complete (other than decoration), but without soft coverings such as carpets on the floors. Tests results are indicative of the performance of other similar properties of the same type and construction. They should be carried out on the first of each type completed, and then at least one set of tests for every further ten properties of each type, as prescribed by the building control body. A set of tests could be a total of two, four or six individual sound tests depending on the scenario.
Depending on the construction type, tests may include a number of airborne tests and impact tests. The approved procedures for testing are set out in Annex B of the approved document.
If tests are failed, remedial work should be carried out, other similar properties tested or remediated, and the rate of testing increased.
The robust details certification scheme provides an alternative to pre-completion sound testing. Users choose details from a handbook, register their plots on the scheme website prior to commencement on site, and notify building control. They must then construct the details in accordance with the handbook specification. For more infomration see: Robust details certification scheme.
[edit] Related articles on Designing Buildings Wiki
- Airborne sound.
- Approved Document E.
- BREEAM Acoustic performance.
- Building acoustics.
- Decibel.
- Noise nuisance.
- Part E compliance.
- Reverberation.
- Robust details certification scheme.
- Room acoustics.
- Sound absorption.
- Sound absorption coefficient.
- Sound frequency.
- Sound insulation in buildings.
- Sound insulation in dwellings: Part 1: An introduction (GG 83-1).
- Sound insulation in dwellings Part 2: New-build (GG 83-2)
- Sound insulation in dwellings: Part 3: Material change of use (conversions) (GG 83-3).
- Sound v noise.
- Structure-borne sound.
Featured articles and news
Sustainable Urban Drainage and Biodiversity
Awards for champions of these interconnected fields now open.
Microcosm of biodiversity in balconies and containers
How minor design adaptations for considerable biodiversity benefit.
CIOB student competitive construction challenge Ireland
Inspiring a new wave of Irish construction professionals.
Challenges of the net zero transition in Scotland
Skills shortage and ageing workforce hampering Scottish transition to net zero.
Private rental sector, living standards and fuel poverty
Report from the NRH in partnership with Impact on Urban Health.
.Cold chain condensing units market update
Tracking the evolution of commercial refrigeration unit markets.
Attending a conservation training course, personal account
The benefits of further learning for professsionals.
Restoring Alexander Pope's grotto
The only surviving part of his villa in Twickenham.
International Women's Day 8 March, 2025
Accelerating Action for For ALL Women and Girls: Rights. Equality. Empowerment.
Lack of construction careers advice threatens housing targets
CIOB warning on Government plans to accelerate housebuilding and development.
Shelter from the storm in Ukraine
Ukraine’s architects paving the path to recovery.
BSRIA market intelligence division key appointment
Lisa Wiltshire to lead rapidly growing Market Intelligence division.
A blueprint for construction’s sustainability efforts
Practical steps to achieve the United Nations Sustainable Development Goals.
Timber in Construction Roadmap
Ambitious plans from the Government to increase the use of timber in construction.
ECA digital series unveils road to net-zero.
Retrofit and Decarbonisation framework N9 launched
Aligned with LHCPG social value strategy and the Gold Standard.
Competence framework for sustainability
In the built environment launched by CIC and the Edge.
Institute of Roofing members welcomed into CIOB
IoR members transition to CIOB membership based on individual expertise and qualifications.
Join the Building Safety Linkedin group to stay up-to-date and join the debate.
Government responds to the final Grenfell Inquiry report
A with a brief summary with reactions to their response.